Blog

We look forward to working with you,mutual benefit and win-win,create brilliant!

Precautions for the operation of high frequency welded pipe machine



Before starting the high-frequency pipe welding machine, it is necessary to check whether the safety cover and other safety devices of the equipment are complete and intact. Check whether the fixing screws of each part are firm. Before work, it is necessary to check whether the fan in the high frequency controller is running normally and smoothly. Check whether the high-frequency die and auxiliary tools are complete and in good condition. Be sure to start debugging after preheating for 5 minutes, and check the basic performance of the equipment, including high-frequency current, whether the switch is flexible, whether the lubrication parts and other components are working normally, and whether there is abnormal noise.

High frequency welded pipe machine

Jiangsu Nanyang Machinery Manufacturing Co., Ltd.