Let's help you
MoreLatest News
Specification process for the use of pipe welding machine
Release time:
2021-11-17 10:34
according to the presentpipe welding machineThe development trend of equipment, how to better use the pipe welding machine equipment is particularly important. Today, we mainly talk about the following points:
1. Do not touch the mold during operation.
2. Before using welded pipe equipment, we should first check whether all lubrication points on the unit are completely lubricated.
3. Be sure to do daily maintenance, so that the service life will be long.
Whether it is the parts or the whole machine, the rust prevention work of the welded pipe unit must be done well. First of all, try to avoid placing the welded pipe equipment in a humid place. In addition, it is a rust-removing grease. In addition to rust prevention, we must also strictly carry out maintenance work.
pipe welding machineThe operation of the group equipment shall strictly follow the normal operation procedure. Before starting the machine, lubricate the machine regularly, regularly and quantitatively according to the lubrication chart. The lubricating oil must be clean and free of impurities.
The welded pipe unit regularly replaces the lubricating oil in the bearing, and regularly checks the electrical appliances to eliminate unreliable safety factors. For the V-belt, handle, knob and button of the pipe welding machine, check regularly for damage.
The specific process flow of butt welding is as follows:
1. After the coil is positioned, the left and right taper heads of the uncoiler can be inserted into the coil and rotated at the same time. Send the wire to the nip roller, press down the upper roller of the nip roller, and the steel coil trolley and magnetic roller can return to their original positions.
2. In order to make the spring steel belt run accurately in the center, the uncoiler can move 150mm axially before running. After the uncoiler is started, the strip steel reaches the straightening machine equipped with dust removal device through the pinch roller.
3. Use sliding hydraulic shear to cut the straightened spring steel strip at the head and tail of the strip (the sheared head of the strip can be immediately slid into the waste bin, and the sheared tail of the strip can be collected through the output device To the dedicated bone silo outside the production line).
Pipe welding machine
Latest News